Inspections
The field inspectors are responsible for inspecting all the various systems and phases of the construction project.
The builder is required to call for the following mandatory inspections:
| Inspection | Inspection Agency | Phone |
| Survey Footing (before placing concrete) | FP Bldg. Dept. FP Bldg. Dept. | (513) 595-5264 (513) 595-5264 |
| Wall foundation | FP Bldg. Dept. | (513) 595-5264 |
| Ground plumbing | (513) 946-7852 | |
| Ground electric | (513) 381-6080 | |
| Foundation waterproofing (after waterproofing & drain tile installed) | FP Bldg. Dept. | (513) 595-5264 |
| Slabs (after ground plumbing & electric inspection, before plumbing) | FP Bldg. Dept. | (513) 595-5264 |
| Rough plumbing | (513) 946-7852 | |
| Rough electric | (513) 381-6080 | |
| Framing (after rough electric & plumbing) | FP Bldg. Dept. | (513) 595-5264 |
| Masonry (call at start of masonry construction for schedule of intermediate inspections) | FP Bldg. Dept. | (513) 595-5264 |
| Rough HVAC (before insulation installed) | FP Bldg. Dept. | (513) 595-5264 |
| All roofing/reroofing, roof sheathing (nailing insp. before applying roofng) except second layer on existing single family homes | FP Bldg. Dept. | (513) 595-5264 |
| Fire Assembly Penetrations Insulation (before applying drywall) | FP Bldg. Dept. FP Bldg. Dept. | (513) 595-5264 (513) 595-5264 |
| Drywall nailing (before taping) | FP Bldg. Dept. | (513) 595-5264 |
| Final plumbing | (513) 946-7852 | |
| Final electric | (513) 381-6080 | |
| Final HVAC | FP Bldg. Dept. | (513) 595-5264 |
| Final building (after or concurrent with other finals) (NO OCCUPANCY PRIOR TO THIS INSPECTION) | FP Bldg. Dept. | (513) 595-5264 |
| Fences (when completed) | FP Bldg. Dept. | (513) 595-5264 |
| Signs (footings and when completed) | FP Bldg. Dept. | (513) 595-5264 |
| Gutters & Downspouts | FP Bldg. Dept. | (513) 595-5264 |
| Exterior Finish | FP Bldg. Dept. | (513) 595-5264 |
| Deck Footing, Framing, Final | FP Bldg. Dept. | (513) 595-5264 |
| Industrial Unit Inspections | FP Bldg. Dept. | (513) 595-5264 |
| Foundation Structure Repair | FP Bldg. Dept. | (513) 595-5264 |
| Hot Water Heater Replacement | Ham. Cty. Health | (513) 946-7852 |
| New or replacement furnaces, air conditioners. New or replacement building mechanical services equipment | FP Bldg. Dept. IBI | (513) 595-5264 (513) 381-6080 |
| New or alterations to slabs, steps, sidewalk, driveway, driveway extensions | FP Bldg. Dept. | (513) 595-5264 |
| Tents | FP Bldg. Dept. | (513) 595-5264 |
| Special Inspections per Schedule of Special Inspections | Per Statement & Schedule of Special Inspections |